Accessibility
Planetary Defense Council
PLANETARY DEFENSE COUNCIL · UNITED NATIONS
Monday, 30 March, Year 4 of the Crisis Era
Preparations under way for the 13th meeting of the Council
Sophon Activity WarningPDC/SAC/WARN-04 · Issued on 22 March, Year 4 of the Crisis Era Anomalies in global hadron collider experiments persist, and the collision window for this season has been postponed again. The public is urged to verify information regarding alleged "breakthroughs in fundamental physics" through this website and the national scientific institutions of member States, and to be wary of pseudoscientific projects seeking to profit from the situation. View instructions and historical warnings

Strategic Planning

PROGRAMS · Overall Layout of Planetary Defense

The Council's strategic assessment is that, on a timescale of four hundred years, defense is not a single campaign but a systematic project spanning more than ten generations. The current strategic layout consists of four main components.

Four Main Components

ComponentMissionCurrent Status
Space ForceCoordination of national Space Force development, establishment of the Joint Staff, officer training, and joint exercisesFramework signed
Staircase ProgramLaunching radiation sail probes toward the Trisolaran Fleet to establish a direct contact channel between humanity and the Trisolaran civilizationLaunch preparation
Aerospace and Nuclear Defense ResearchResearch and Technology Development Layout and Joint Funding under the Sophon LockdownOngoing
Wallfacer ProjectA special strategic plan relying on the confidentiality mechanism of strategic intent, with Wallfacers directly subordinate to the CouncilIn Progress

Overview of Project Progress

  • Staircase Program · Nuclear Array Deployment: 71% (the 18th batch of arrays has been positioned in orbit)
  • Space Force Joint Staff Framework: 34% (establishment plan pending review at the 13th meeting)
  • Round 3 of Countermeasures for Anomalies in the Collider: 100% (accepted)
  • Stars Plan · Registration and Acceptance Network: 12% (embassies of various countries under construction)
The progress percentages are based on the engineering ledgers of the Planetary Defense Council Secretariat, with updates occurring approximately once a month.